Spray-On Colloidal Silica Concrete Treatment

Technician applying Edyston spray-on colloidal silica treatment to concrete infrastructure
Spray-on colloidal silica — field verified

Concrete that
heals itself.

A spray treatment that soaks into your concrete and stops it from cracking, rusting out, and falling apart. One pass. No lane closures. No tearing anything out.

30–50%

More Service-Life

37%

Bridges Deficient

600K

Concrete Bridges

18 hrs

To Stop Leaks

Fit Consultation

Find out if Edyston is right for your structure.

Wondering about cost? See product prices and a project cost example.

The Reality

America’s concrete is failing faster than we can replace it.

ASCE grades the nation’s bridges a C. The fix isn’t always demolition.

0

concrete bridges already due for repair or replacement

600,000

total nationwide

43%

Source: FHWA, NBI · national bridge inventory

0%

of U.S. bridges rated structurally deficient

Source: FHWA

$0.0B

spent every year repairing concrete infrastructure

Source: FHWA, annual

¼

of U.S. bridges have outlived their 50-year design life

Source: FHWA

The Science

Penetrates. Densifies. Heals.

Here’s exactly what happens inside the concrete after a single spray application — four reactions, working at the same time.

01

Penetrates

Colloidal silica travels through the pore structure, reacting on contact with free calcium hydroxide inside the concrete.

02

Densifies

The reaction converts pore water into C-S-H — the same compound that gives concrete its strength — tightening the pore network from within.

03

Immobilizes

Chlorides and road salts that migrate through concrete get trapped in the new crystalline structure before they can corrode reinforcing steel.

04

Self-heals

Micro-cracks that later appear give the treatment fresh calcium hydroxide to react with — blunting and healing cracks as they form.

“Spray-on colloidal silica that locks down the chemicals that destroy concrete — before they ever get the chance.”

Ready to discuss your structure?

The Difference

Nothing else does all four.

EdystonTypical
Hardens concrete from the inside out
Stops road salt from attacking rebar
Self-heals cracks as they form
Goes on as a spray — no tearout

Field Proof

30–50% more available service-life.

Not a lab claim — these numbers come from active Indiana DOT infrastructure. On average, structures treated with Edyston last 30–50% longer before major work is needed — a preservation option to evaluate against the cost of replacement.

Proven on

Technician applying Edyston spray treatment to a bridge girder

Field application

One spray pass. No lane closures required for cure.

0%

reduction in concrete permeability vs. untreated

Kruse Tunnel \u00b7 56 core samples, 3rd-party lab

0%

increase in overlay bond strength

3rd-party lab \u00b7 ASTM C1583 pull-off test

0%+

reduction in mass loss from abrasive wear

IND-DOT grooved overlay \u00b7 ASTM C1803

Figures reflect on-average results from third-party lab and DOT field data. See case studies below.

New from Edyston · GYOSTON-NoSoak

Condition aggregate in the mix. Not in the pile.

GYOSTON-NoSoak is a liquid colloidal-silica-based aggregate conditioning treatment used directly in the concrete mixing process — eliminating the days of sprinkler presoaking that absorptive aggregate normally demands before batching.

Instead of acting as an uncontrolled water sink, treated aggregate participates in the cementitious system — supporting more stable slump behavior, reduced permeability potential, and strength development.

NoSoak Technical Data Sheet
Absorptive aggregate discharging from a concrete mixer

In-mixer conditioning · no sprinkler presoak

Built for today’s aggregate challenges

  • Recycled Concrete Aggregate (RCA/CCA)

    Old adhered paste increases absorption and moisture variability.

  • Lightweight Aggregate

    Internal absorption must be managed before and during batching.

  • Manufactured Aggregate

    Surface texture, fines, and absorption create water-demand risk.

Eliminate days of presoaking

Start production sooner and keep aggregate off the sprinkler pile.

Control moisture demand

More accurate water accounting and fewer batch adjustments.

Improve concrete performance

Better slump retention, lower permeability potential, and strength development.

Reduce variability & risk

More consistent batches and fewer surprises in the field.

Fit Consultation

See if Edyston is right for your structure.

A materials engineer confirms whether Edyston is the right match for your project within one business day.

Wondering about cost? See product prices and a project cost example.

The Budget Math

Fits repair budgets, not replacement budgets.

Full replacement is a $48B national rebuild cycle. Edyston doesn’t compete with that number — it rides inside the repair line item you already have, and pushes replacement years down the road.

Preservation funding is flowing right now

The FY26 federal Bridge Investment Program grew 87.5% to $1.5B — earmarked for exactly this kind of preservation work.

SR 101 Bridge Pier Repair · Indiana DOT

1.5%

of total project cost.

Four concrete bridge piers rejuvenated — with Edyston accounting for less than 1.5% of what the project cost overall.

Edyston-treated concrete bridge pier at the Kruse Tunnel field project
Within 18 hours it was clear that EDYSTON had stopped any water migration through the areas it was applied — while water continued to drip from the untreated side of each joint.

Kruse Tunnel Field Report

Case Study — Indiana DOT · Fort Wayne, IN

IN-DOT Field TestedASTM C1583 Verified6 Active Projects

Field-Verified Results

Six projects. Real numbers.

Third-party lab verified. Deployed on active Indiana DOT infrastructure.

Tunnel Waterproofing
Fort Wayne, IN · Indiana DOT

Kruse Tunnel

Stopped water migration within 18 hours

56 core samples showed permeability reduced 10–40% versus untreated concrete, confirmed by independent lab analysis.

View full case study (PDF)
Kruse Tunnel side-by-side: damaged concrete versus the Edyston-treated side
Untreated vs. Edyston-treated — Kruse Tunnel · Source: full report
01 / 06

How It Works

What a fit consultation looks like.

No sales pitches. Just engineers confirming whether Edyston fits your structure.

1

Step 01

Request a Fit Consultation

Submit details about your structure — age, current condition, timeline, and goals. We’ll tell you plainly whether Edyston is the right match. Takes under two minutes.

Same day
2

Step 02

Material Review

An Edyston materials engineer reviews your submission to determine viability and expected outcomes for your specific structure.

Within 1 business day
3

Step 03

Preservation Plan

We map out the application process, projected service-life extension, and exactly how it fits your existing repair budget line.

Delivered as a written plan
DOT Officials working with Edyston concrete infrastructure treatment
Bridge & Structural Engineers working with Edyston concrete infrastructure treatment
Civil Consultants working with Edyston concrete infrastructure treatment
Contractors working with Edyston concrete infrastructure treatment

Built for the people who keep infrastructure standing.

Budget-Driven Preservation

DOT Officials

Stretch preservation budgets further. Extend service-life on structures already on the deficiency list without a full replacement project.

Cost & value

Know the product price. Plan the project savings.

See current store prices

What could preservation save?

On the SR 101 bridge pier project, DENSYGEL product cost was $5.50 per treated sq ft and Edyston treatment for four piers accounted for less than 1.5% of the total project cost. That is a project cost share, not a 98.5% savings claim. Actual dollars saved depend on your alternative repair or replacement bid, structure, quantity, and installation scope.

Request a consultation below to compare a preservation plan with your project budget. The $5.50/sq ft figure is from that past project, not a current price. Prices above are product-only store ranges, not installed project quotes; check the store for current pricing.

Start Your Preservation Plan

Stop managing decline.

In one Indiana bridge-pier project, Edyston treatment made up less than 1.5% of the total project cost. Let’s look at what preservation could cost for your structure.

Wondering about cost? See product prices and a project cost example.

ASTM C1583 ASTM C1803 IN-DOT Field Tested 6 IN-DOT Projects

Common Questions

Engineering & Procurement FAQ